We've places near

0800 731 0300
X
#

Enter location

For some companies, where they are located says a lot about their brand. Tell us where you’d like your business to be.

#

Filter your results

What’s important to you? Price? Size? Type of space? Maybe there’s specific features you want. This section will help us to hone down on your ideal office.

#

Save or enquire

Make a shortlist of your favourites by clicking the hearts next to our properties. You can view, add or remove these at any time in the ‘My places’ section. Alternatively, fill in an enquiry form and we’ll get back to you.

City House redevelopment

Share

Work on City House in Leeds is now well and truly underway. Having been on-site since October 2015, we spoke to the Head of Building and Construction for Leeds, Nathan Green to find out what plans have been made for the redevelopment and what changes are already taking place.

Prominently situated on the top of Leeds train station, the location of City House will be ideal for future customers, however, it currently poses a lot of challenges when it comes to the redevelopment of the building. As the third busiest station outside of London, footfall around Leeds train station is tremendously high and so providing access to the site required some creative thinking. “Ultimately, our top priority is a safe working environment so we had to think of ways to access the site while not interfering with the train station and the people using it on a daily basis. To meet this requirement we made sure that we hired the right team and spent enough time planning the works,” explains Nathan.

Due to its placement above the train station, City House actually only touches the ground in three places. “It’s an elevated building meaning street level access is limited, with construction deliveries being extremely restricted. Added to the fact that New Station Street provides bus lanes, taxi ranks, British Transport Police offices and delivery for Station retail units, accessing the project via the front door was not going to be viable,” says Nathan.

“We decided to create an opening through the street directly into the basement of City House and install a hoist going up the side of the building,” explains Nathan. All of the materials have to be taken to the different areas of the building via the hoist and the construction team has to make sure they programme the work carefully, reserving slots to bring their supplies to the correct area of the development. And that’s not an easy feat considering there is 154,000 sq ft gross internal area of space to be refurbished. Once the hoist is removed we will install a new permanent lift using the same opening, providing access directly from the basement into the building.

Another interesting challenge of the project is that the street that City House is located on is actually a bridge spanning one of the main routes into Leeds. This meant that fully scaffolding the building was not possible due to loading restrictions, so alternative ways of taking down the facade had to be explored. One benefit of this is that the public can see the building change as the project moves along, whereas with scaffolding it would typically be unveiled upon completion.

City House empty floor plate

And here’s what you can see so far. “The main work that has taken place is the demolition of the facade, followed by the installation of floor to ceiling windows which can be seen from street level. Inside the building, the team have commenced with the Mechanical and Electrical works to provide fully-conditioned space in the office suites,” says Nathan. “Later in the year, as the elevations approach completion, we will continue with the internal finishes, progressing through the building”.

The building has been designed and constructed to promote sustainability. “What’s more sustainable than refurbishing an empty building?” says Nathan. However, the building will be almost unrecognisable when completed as, although the frame and floors are being retained, all other elements are renewed to modern standards. When completed, the suites will have an EPC rating of A and the building will have a BREEAM excellent rating. Customers can expect to benefit from high specification office accommodation including LED lighting, showers, cycle facilities and basement parking with electric car charging points.

At roof level, there is already a lot of work taking place in preparation of the roof garden works. “The existing concrete walkway that was elevated above the roof has been 50% demolished and once this process is complete we will install the plant deck and recover the roof surface. Then we can begin with the roof garden, which once complete will offer unrivalled views across the city,” explains Nathan.

City House roof garden CGI

The redevelopment is set to take 84 weeks and after over six months on-site the project remains track. With a completion date of the end of May 2017, the building will be a new platform for Leeds and is set to be one of the most modern workspaces in the city.

More Stories

News ·

23 February 2018

Customer stories: LEAF

News ·

22 February 2018

Office design: the anti-trend

News ·

19 February 2018

Customer stories: LightStart

News ·

15 February 2018

Office design: creating spaces for people

News ·

09 February 2018

Office space design: Biophilla

News ·

08 February 2018

Creating spaces for communities and growth

News ·

07 February 2018

Our partners: Factory Youth Zone

News ·

05 February 2018

Customer stories: Kwizzbit

News ·

29 January 2018

Our partners: Bruntwood Prize for Playwriting

News ·

25 January 2018

Why 'Places Matter'

News ·

22 January 2018

Customer stories: Love Raw

News ·

08 January 2018

Customer stories: British Para-Swimming

News ·

22 December 2017

Bruntwood's cultural activity 2017

News ·

18 December 2017

Binary Festival brings together the North's digital and creative community

News ·

28 November 2017

5 top tips for great coworking etiquette

News ·

09 November 2017

How can coworking benefit your business?

News ·

01 November 2017

Coworking revolution brings business success

News ·

27 October 2017

Which office space is right for you?

News ·

10 October 2017

How office environment can impact your employees' mental health

News ·

27 September 2017

How is your workplace linked to staffing, innovation and growth

News ·

26 September 2017

Putting the new into Old Trafford

News ·

25 September 2017

Bruntwood backs Leeds 2023: European Capital of Culture bid

News ·

20 September 2017

Keep on moving - injecting energy into the workplace

News ·

20 September 2017

Flexible working goes beyond the city borders

News ·

19 September 2017

'The repositioning of retail places' - James Tootle, Surveyor

News ·

18 September 2017

8 ways to make the most of your commute

News ·

04 September 2017

Real Junk Food Manchester opens new site on Oxford Street

News ·

05 May 2017

Psychology & office design: How new generations are shaping the places they work

News ·

21 March 2017

Female entrepreneurs: Increasingly pushing the north's economy forward

News ·

18 October 2016

Low cost ways of keeping it fun in the office

News ·

18 April 2017

Move over millennials: What do Generation Z expect from the workplace?

News ·

28 March 2017

The rise of Leeds: The Uk's vibrant hub of culture

News ·

18 January 2017

Workplace trends for 2017

News ·

25 October 2016

Top reasons why businesses are moving to the north

News ·

10 February 2016

The future of workspaces

News ·

07 April 2016

A new Platform for Leeds